Skip to main content
Abbotsford & area concrete contractor · Free written estimates
(778) 601-9189

Mapei · Self-Leveling

Tile-Ready Substrate with Mapei Self-Leveling in Abbotsford

When your tile contractor specifies Mapei, we install Mapei. Ultraplan and Novoplan are the self-leveling underlayment products the tile trade trusts for warranty and performance. We source the matched Mapei primer, pour to depth, and cure to schedule so the substrate is ready for tile. No substitutions, no shortcuts. Free written estimate on every project.

  • Mapei-certified installer
  • Matched primer included
  • Free written estimate, firm schedule

Tile trade standard

Why Tile Contractors Specify Mapei SLU

Mapei self-leveling underlayment is the product line tile installers reach for when the floor finish needs to carry a system warranty. Ultraplan works for shallow-to-moderate depth applications; Novoplan handles thicker pours and structural-spec conditions. The Mapei primer is formulated to bond with the SLU chemistry, and using anything else breaks the warranty.

We install Mapei SLU as the Mapei specialist. We apply the matched primer, select the right product for your depth, and follow the cure schedule so the substrate meets the tile installer's tolerance. If your project also needs Mapei waterproofing for wet zones, we coordinate that into the prep. See our full Mapei product range for other applications.

If the spec calls for Ardex self-leveling instead, both systems are excellent. The choice depends on your tile contractor's preference and warranty requirements.

Recent work
Mapei Ultraplan being poured on an Abbotsford substrate
Tile installer working over cured Mapei SLU substrate

Installation sequence

How We Install Mapei Self-Leveling in Abbotsford

  1. Assess substrate and product fit

    We evaluate the existing slab, measure depth requirements, and confirm with your tile contractor whether Ultraplan or Novoplan is the right choice for the project.

  2. Prepare and prime the slab

    The concrete surface is diamond-ground to Mapei profile, cleaned of dust and contaminants, then primed with the matched Mapei primer for permanent adhesion.

  3. Mix and pour the SLU

    Mapei SLU is mixed to the manufacturer's water ratio, poured across the floor, and allowed to self-level. The working window is tight, so we move efficiently through the pour.

  4. Cure and hand off

    The slab cures per Mapei schedule, final flatness is verified against the tile spec, and the substrate is ready for the tile installer to begin their work.

Warranty coordination

Respecting the Tile Contractor's Mapei Specification

When a tile contractor writes Mapei into the spec, they are protecting their warranty path and relying on a system they know. We honor that specification by installing Mapei, not a substitute. The tile trade gets the substrate they expect, and their warranty stays intact.

If substrate damage or prior repairs need attention, we can use Mapei repair products to prepare the slab first. Explore our other brand specialties for projects with different product requirements.

Quote Mapei SLU
Finished Mapei SLU substrate in an Abbotsford project
Mapei-spec Primer + SLU
Tile-ready Substrate tolerance
Free Written estimate

Common questions

Mapei SLU Questions, Answered

Ultraplan vs Novoplan, tile-trade warranty, primer and coordination.

Ultraplan for feather-to-moderate depth pours; Novoplan for thicker pours and structural-spec applications. We pick based on the substrate condition and target depth confirmed with the finish-flooring installer.
Because they trust the Mapei system warranty for their tile install on top, and they have install experience with the Mapei substrate. Honoring the spec keeps the tile-install warranty intact.
Yes. The Mapei primer is calibrated to the SLU chemistry; a generic primer or no primer voids the system warranty and risks delamination. We use the matched primer always.
Not typically; Mapei SLU is designed as substrate for finish flooring. For polished-as-finish projects, a different product family is the right call.
Per Mapei spec, typically within a day or two depending on product and depth. The tile installer's spec also matters; we coordinate the cure handoff with them.

Client reviews

What Abbotsford Clients Say About Mapei SLU

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

They installed Mapei to spec, including the matched primer. My tile install warranty stayed intact, which is why I keep requesting them on projects with Mapei specced.

Z. B6
Tile Contractor, Abbotsford
★★★★★

Mapei was on the spec sheet from the tile trade. They sourced and installed Mapei, not a substitute. Tile install went cleanly, no callbacks. Spec respect matters.

Y. B6
GC, Chilliwack
★★★★★

Multiple buildings with Mapei substrate for high-end tile install. Consistent quality across all of them, tile trade approved each substrate without complaint.

Q. B6
Property Developer, Mission
★★★★★

They explained why the tile contractor's Mapei spec mattered for warranty path. Installed accordingly. Real awareness of trade coordination.

X. B6
Custom Builder, Langley

Ready to start

Get a Free Mapei SLU Quote

Share the substrate condition, target depth, and the tile contractor's spec, and we will recommend the matched Mapei product and send a written quote.

We'll assess and send a written quote within one business day.