Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Manufacturing · ESD
Anti-Static (ESD) Flooring in Abbotsford
Electrostatic discharge destroys electronics. In manufacturing zones where ESD damage is a real risk, the floor itself has to dissipate static charge from people, equipment, and carts before it can reach sensitive components. Abbotsford Concrete installs ESD-dissipative flooring systems with verified resistance ranges that meet industry standards for electronics manufacturing, clean rooms, and sensitive assembly areas. Every project starts with a free written estimate.
- Verified resistance range
- Grounded to electrical system
- Free written estimate, firm schedule
Why ESD spec
What ESD Flooring Has to Deliver
An ESD floor is not just conductive or insulating; it has to be in a specific resistance range, dissipative, that lets static charge flow to ground at the right rate. Too conductive and electrical safety becomes a concern; too insulating and static charge builds up faster than it dissipates. The middle range is what dissipates safely.
We install ESD systems with the resistance range your facility's ANSI/ESD standard requires, properly grounded to the electrical system, and verified with a megohmmeter after install to confirm the spec is met. The system holds its resistance for years with proper maintenance using ESD-compatible cleaning chemicals.
Same engineering across our manufacturing services and the broader industrial concrete work. For EV battery manufacturing specifically, see clean room concrete floors; for chemical-rated zones in the same facility, chemical-resistant flooring may be the right pair.
How it works
How We Install ESD Flooring in Abbotsford
-
Confirm ESD standard
We confirm which ANSI/ESD standard applies (electronics manufacturing has its own; clean rooms may have stricter), the target resistance range, and the grounding scheme that ties the floor system to the building electrical.
-
Prep slab and install grounds
The slab is diamond-ground to the system's prep profile, copper ground strips are installed in the floor at the spec spacing, and the ground points are connected to the building electrical ground at the engineered spec.
-
Install ESD system
The matched ESD-dissipative epoxy system is installed, primer through topcoat, with the conductive elements (carbon black, conductive aggregate) at the right loading to land in the target resistance range.
-
Verify and document
After cure, the finished floor is verified across multiple points with a megohmmeter, the resistance range is documented for each zone, and the report is handed off to facility for ongoing audit and recertification.
Why ESD floors get this
Verification Is the Deliverable
An ESD floor that looks installed correctly but does not meet the resistance spec is functionally useless and may even create electrical safety issues. Megohmmeter verification across the finished floor at multiple points is what confirms the system is doing its job. We never hand off an ESD floor without verified resistance documentation.
Coordinate the install with the electrical contractor on the building ground scheme, and with adjacent manufacturing floor systems in zones that do not require ESD. The transition from ESD to standard floor is detailed cleanly so each system works in its zone, integrated into our broader industrial concrete work.
Other manufacturing services
Compare with Other Manufacturing Services
ESD is one of four manufacturing services we offer. See the rest.
Heavy-Duty Concrete Floors
High-strength manufacturing floor systems engineered for heavy equipment and impact.
Learn moreChemical-Resistant Flooring
Urethane and specialty epoxy systems rated for industrial chemical exposure.
Learn moreDust-Proof Concrete Sealing
Densifier and sealer systems that lock down concrete dust for cleaner facilities.
Learn moreCommon questions
ESD Flooring Questions, Answered
Resistance ranges, grounding, verification and which manufacturing zones need ESD.
ESD floor installed and verified across our assembly zone. Resistance documentation supported our customer compliance audit. The system has held for two years of daily operation.
They knew the ANSI/ESD spec cold, coordinated with our electrical contractor on grounding, verified with the megohmmeter at handoff. No improvisation, no audit findings.
Stricter clean room ESD spec, they hit it. Documentation, grounding, verification all in order. The auditor specifically called out the install quality.
Phased ESD install during off-shifts so production never stopped. Each zone verified before reopening, no resistance drift between zones. Real coordination.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Abbotsford.
Ready to start
Get a Free ESD Floor Quote
Tell us the ESD standard you operate under, the zones requiring coverage, and your operating schedule, and we will spec and quote the install with verification documentation.
We'll assess the facility and send a written quote within one business day.